Portfolio

2 West Fern

Weatherproof Planning to Keep a Medical Office Open and Protected

The Challenge: When an already-leaking 20,000 sq. ft. roof on a fully operating medical office needed replacement during the fall and winter rainy season, how could the project stay on schedule while protecting the building, its staff and patients, and a power shutdown that couldn’t take the facility offline?

Our Solutions:

  • Phased the roof replacement in two sections to limit exposure

  • Self-performed HVAC and electrical, including disconnecting and resetting rooftop units

  • Daily communication with tenants, frequent updates with building management, and weekly owner check-ins

  • Weekly safety meetings, with zero safety incidents

  • On-site crews through every storm, including overnight stays to clear pooling water and repair damage

  • Weekend power shutdown with no patients on site

  • Backup generator tested twice, then a seamless transfer to new power with no downtime

  • Completed on time in 88 days, with no disruption to building operations

US Bank

Safety and Security Measures to Guarantee Uninterrupted Business Operations

The Challenge: As US Bank conducted massive renovations of various branches. How could they continue branch operations while maintaining security and safety for customers and staff?

Our Solutions:

  • Purposeful phase work
  • Comprehensive interior and exterior renovations
  • Strategic temporary walls to prevent unauthorized access of any sort
  • Provided high security measures, even for temporary teller stalls
  • Installated a new cash safe, securely removing the old safe
  • Created clearly-marked areas for safe passage of travel – avoiding trip hazards
  • Improved ADA-compliance including parking spaces
  • A safe, clean environment while work was ongoing

CRC

Precision and Craftsmanship for the Aerospace Industry

The Challenge: CRC was part of the team supporting LaunchPoint, an aerospace organization, in an extremely time-sensitive industrial space relocation and TI. When design flaws were suddenly noticed early in the project, how could CDC still meet deadlines on such an enormous scale (across 25,000 sq. ft custom buildout), including high voltage electrical work, without compromising safety or time?

Our Solutions:

  • Used Delta’s expertise and our proprietary historical data to immediately help solve design flaws, including more accurate equipment orders

  • Leveraged our in-house fleet of tradesmen to meet sensitive timelines

  • Brought massive manpower – over 20+ workers on-site to meet deadlines

  • Delivered flexibly -including nights and weekends- to support client needs for continuous operations

  • Serviced remaining equipment to assure operational status

  • Safely and quickly installed all necessary new equipment

United Health Group

Strategically Phased Schedules for Cleanliness, Comfort and Safety

The Challenge: When United Health Group needed to replace an enormous (65 and 70 ton) boxcar HVAC unit across two stories of a high-sensitivity healthcare facility, how could they maintain a safe and comfortable environment for patients and staff?

Our Solutions:

  • Custom-designed HVAC units

  • Disassembly and on-site reassembly of equipment

  • Adapted work hours to avoid business interruption

  • Protected paths of travel (removed every night)

  • Temporary air systems

  • Extra hygienic, fully operational work conditions